PROJECT NAME: W2 TOWER FOUNDATION, YERBA BUENA ISLAND
Malcolm Drilling was selected to help construct the W2 tower foundation (composed of 4 large diameter shafts) located on Yerba Buena Island for the new Bay Bridge. The drill rig, a Casagrande C-60 weighing over 260,000 lbs was disassembled into 3 major sub-assembles and lowered into the new footing and reassembled. After completion of the drilling the removal was done in the reverse manner. The actual drilling took place in a newly blasted excavated footing that measured 60 ft
by 80 ft. |