Drilled Shafts...Oscillator/Rotator Shafts...Conventional Shoring...Pre-drilled/Vibrated Piles...Tieback & Tiedown Anchors...Soil Nailing/Vnail Systems...Temporary & Permanent Shotcrete...Sculptured Shotcrete...Secant Pile Walls...Cylinder Pile Walls...Access Shafts...Micropiles...Augercast Piles...Drilled Displacement Piles...Deep Soil Mixing...Cutter Soil Mixing...Jet Mixing...Jet Grouting...Compaction Grouting...Chemical Grouting...Vibro Compaction...Stone Columns...Aggregate Piers...Dynamic Deep Compaction...Dewatering.
DRILLED SHAFTS

Echelon Towers, Las Vegas, NV

Tishman Contractors and Boyd Gaming selected Malcolm Drilling to utilize its state of the art fleet of top drive hydraulic drill rigs to construct the foundation piles for the 3,300 room Echelon Resort, encompassing two upscale hotels, a 2,600 room Resort Tower and a 700-room Suite Tower. The foundation package for the Resort consisted of 244 drilled shafts, of which 189 were 6 feet in diameter and averaged 117 feet in length. Malcolm completed all of the shafts in 29 working days, averaging over 700 cubic yards of concrete per day.

 

 
Terms of Use | Privacy Statement © 2010 Malcolm Drilling Co., Inc. All rights reserved