Drilled Shafts...Oscillator/Rotator Shafts...Conventional Shoring...Pre-drilled/Vibrated Piles...Tieback & Tiedown Anchors...Soil Nailing/Vnail Systems...Temporary & Permanent Shotcrete...Sculptured Shotcrete...Secant Pile Walls...Cylinder Pile Walls...Access Shafts...Micropiles...Augercast Piles...Drilled Displacement Piles...Deep Soil Mixing...Cutter Soil Mixing...Jet Mixing...Jet Grouting...Compaction Grouting...Chemical Grouting...Vibro Compaction...Stone Columns...Aggregate Piers...Dynamic Deep Compaction...Dewatering.

I-5/SR502 Interchange, Vancouver, WA

Constructing 3 meter diameter Shaft at Pier 3:
Malcolm Drilling furnished and installed 9’ diameter permanent steel casing at six (6) shaft locations with Leffer 3m oscillator equipment on this project: four pier locations were installed from existing grade, and two were installed from a sheetpile supported workbench and finger piers constructed over the edge of the work bench. Permanent steel casing segments were welded together vertically over the shaft location with the deepest casing installed at a length of 176’. A Liebherr 883 dig crane excavated the shafts utilizing a 3M spherical grab, dumping shaft spoils into waiting dump trucks. A Liebherr 873 was used as the support crane for placing and supporting the reinforcing cage, and other associated operations.

 

 
Terms of Use | Privacy Statement © 2010 Malcolm Drilling Co., Inc. All rights reserved