Drilled Shafts...Oscillator/Rotator Shafts...Conventional Shoring...Pre-drilled/Vibrated Piles...Tieback & Tiedown Anchors...Soil Nailing/Vnail Systems...Temporary & Permanent Shotcrete...Sculptured Shotcrete...Secant Pile Walls...Cylinder Pile Walls...Access Shafts...Micropiles...Augercast Piles...Drilled Displacement Piles...Deep Soil Mixing...Cutter Soil Mixing...Jet Mixing...Jet Grouting...Compaction Grouting...Chemical Grouting...Vibro Compaction...Stone Columns...Aggregate Piers...Dynamic Deep Compaction...Dewatering.
SLOPE STABILIZATION

Slick Creek Rentention Reservoir

Project consisted of stabilization of right abutment slope utilizing 200 permanent double corrosion protected strand anchors. Anchors consisted of 24 strands in 6’’ fully cased hole with total length of 130 to 200 ft through slide debris. Bond length in rock was 35 ft. Design load for anchors was 275 Kips.

All drilling was performed using a Klemm KR807 with double flushing head.

 

 