Drilled Shafts...Oscillator/Rotator Shafts...Conventional Shoring...Pre-drilled/Vibrated Piles...Tieback & Tiedown Anchors...Soil Nailing/Vnail Systems...Temporary & Permanent Shotcrete...Sculptured Shotcrete...Secant Pile Walls...Cylinder Pile Walls...Access Shafts...Micropiles...Augercast Piles...Drilled Displacement Piles...Deep Soil Mixing...Cutter Soil Mixing...Jet Mixing...Jet Grouting...Compaction Grouting...Chemical Grouting...Vibro Compaction...Stone Columns...Aggregate Piers...Dynamic Deep Compaction...Dewatering.
DRILLED SHAFTS

Stanford Stadium, Stanford University, California

Minutes after the completion of their last home game of the 2005 season, demolition commenced on the existing stadium structure in order to rebuild a new stadium complex. The schedule required that the new stadium was to be completed for the opening game of the 2006 football season. Schedules were highly compressed for all contractors working on the project.

The General Contractor Vance Brown selected Malcolm Drilling for the installation of the drilled piers and gave them the challenge of completing their work within a very tight schedule.

Malcolm Drilling rose to the challenge and completed the 598 drilled shafts (18, 349 Lf) 20 days ahead of schedule.

 

 
Terms of Use | Privacy Statement © 2010 Malcolm Drilling Co., Inc. All rights reserved