| Stanford Stadium, Stanford University,
California
Minutes after the completion of their last home game
of the 2005 season, demolition commenced on the existing
stadium structure in order to rebuild a new stadium
complex. The schedule required that the new stadium
was to be completed for the opening game of the 2006
football season. Schedules were highly compressed for
all contractors working on the project.
The General Contractor Vance Brown selected Malcolm
Drilling for the installation of the drilled piers and
gave them the challenge of completing their work within
a very tight schedule.
Malcolm Drilling rose to the challenge and completed
the 598 drilled shafts (18, 349 Lf) 20 days ahead of
schedule.
|