Market: Commercial

Brickell Flatiron

CFA Mega Pile Installation at Brickell Flatiron Malcolm’s Brickell Flatiron project provided a perfect opportunity to debut a new Liebherr LR 1300 crane equipped with a Bermingham lead system to...

Miami-Dade Courthouse

Securing Miami-Dade Courthouse by Installing a Retention System Malcolm Drilling was contracted to implement the retention system for the Miami-Dade Courthouse, a historic 28-floor landmark in Miami, Florida. Following safety...

Google Bayview Campus

Geothermal Foundation System: Omega Piles and Geothermal Loops The new Google Bay View Campus, located adjacent to NASA’s Ames Research Center in Mountain View, will house 4,000 new employees at...

Go East Landfill

Using Dynamic Compaction on soft soils. During a new housing development project in Everett, Washington, Malcolm Drilling conducted dynamic compaction on a detention pond set in soft soils.  The compaction...

Zilker Point

Transforming Challenges into Solutions with Diaphragm Walls Zilker Point, a remarkable architectural project located in Austin, Texas, boasts not only a 7-story above-grade office building but also a 5-story below-grade...

Adrian Science Park

Solutions at MBASP Adrian Science Park: A Deep Dive into Shoring and Dewatering The MBASP Adrian Science Park project, situated at 210 Adrian in Millbrae, CA, is a 260,000 square...

30 Van Ness

Malcolm Drilling's Role in San Francisco's 30 Van Ness Development 30 Van Ness is a 47-story mixed-use development in San Francisco's new "Hub" area, featuring 234,000 sq. ft. of office...

Project One

Shoring & Dewatering for Project One Construction Project One is the first building in the master plan for the development of 22 acres, featuring a mix of residential, office, and...

ABB North and South

Dynamic Compaction for Unclassified Debris. A leading global technology company is constructing a new headquarters and production plant for its U.S. business on an undeveloped property in New Berlin, Wisconsin....

Boca Beach House

Boca Beach House Ground Improvement Lying directly at the Boca Inlet and on the edge of Lake Boca is the development of the luxury 4-story property. The Boca Beach House...

San Francisco Flower Mart

San Francisco Flower Mart The future home of the San Francisco Flower Mart in Potrero Hill.  The project consists of constructing a new parking garage and an extensive seismic retrofit...

24th & Harrison

Ground Improvement at 24th & Harrison 24th and Harrison is a residential mixed-use project that has undergone a significant transformation. Located in the heart of Oakland's Broadway Auto Row, this...

Santa Monica Beach House

Santa Monica Beach Club: Malcolm Drilling's Efficient Solutions Malcolm Drilling was contracted for a project involving both the installation of a tangent pile wall and the design and installation of...

Santa Clara City Center

Installing Monitoring Wells for Well Abandonments Malcolm Drilling provided the sonic drilling method to abandon 62 wells from the Santa Clara Valley Water District (SCVWD) the field activities were conducted...

Mission Rock

Vacuum Wellpoint Dewatering System at Mission Rock Located on the sunny shores of the historic Mission Bay district, the Mission Rock Resort hired Malcolm Drilling to design a vacuum wellpoint...

Oakland UPS

Malcolm Drilling Company Inc. (MDCI) was tasked with providing the foundation support needed for the United Parcel Service (UPS) to introduce sweeping renovations to their Oakland Facility. This included introducing...

200 Park Ave

Malcolm's Infrastructure Expertise in Shoring and Dewatering at 200 Park Ave, San Jose 200 Park Ave stands as a 19-story tech-oriented office tower, complete with four levels of underground parking,...

Block 185

Cut-off Wall Solution for Block 185 Block 185 is a 37-floor building with six basement floors below the ground surface, situated beneath the groundwater. The project is within 300 feet...

Adobe North Tower

Adobe North Tower: Innovations in Deep Foundations and Dewatering The North Tower, located at Adobe's global headquarters in downtown San Jose, comprises a two-level underground parking garage and an 18-story...

MACY’S OVERHAUL

Malcolm is currently working on installing micropiles to temporarily underpin an existing retail building in San Francisco.  The underpinning is required support the building during removal of exterior walls and...
Malcolm Drilling