Project Category: Cut-Off Walls

SFPUC Biosolids

SFPUC Biosolids Digester Facilities: Malcolm Drilling's Successful Partnership The San Francisco Public Utilities Commission (SFPUC) is a city department that provides drinking water and wastewater services to San Francisco, as...

Google Bayview Campus

Geothermal Foundation System: Omega Piles and Geothermal Loops The new Google Bay View Campus, located adjacent to NASA’s Ames Research Center in Mountain View, will house 4,000 new employees at...

Priest Rapids Dam

Dam Embankment Improvement: Enhancing Seismic Resilience The Priest Rapids Dam Embankment Improvement Project involved the replacement of the existing right earthen dam embankment with a Roller Compacted Concrete (RCC) structure...

Ship Canal Tunnel

Constructing Seattle's Ship Canal Tunnel to Enhance Water Quality The Ship Canal tunnel underground storage is a 2.7-mile stretch from Ballard to Wallingford. The tunnel will prevent an average of...

Zilker Point

Transforming Challenges into Solutions with Diaphragm Walls Zilker Point, a remarkable architectural project located in Austin, Texas, boasts not only a 7-story above-grade office building but also a 5-story below-grade...

Riverfront

Transforming the Riverfront in Santa Cruz, CA Situated along the San Lorenzo River in downtown Santa Cruz, California, the Riverfront Project is a development that comprises three 7-story residential apartment...

GBF Landfill

Cut-Off Wall Design for Active Landfills Malcolm Drilling designed a cut-off wall test section with an embedded HDPE membrane to provide permeability on the order of 10-8 cm/sec around an...

30 Van Ness

Malcolm Drilling's Role in San Francisco's 30 Van Ness Development 30 Van Ness is a 47-story mixed-use development in San Francisco's new "Hub" area, featuring 234,000 sq. ft. of office...

Transbay Transit

Malcolm Drilling's Role in the Transbay Transit Center Project Transbay Terminal is a transportation complex in the South of the Market area of San Francisco, roughly centered on Mission Street,...

200 Park Ave

Malcolm's Infrastructure Expertise in Shoring and Dewatering at 200 Park Ave, San Jose 200 Park Ave stands as a 19-story tech-oriented office tower, complete with four levels of underground parking,...

Block 185

Cut-off Wall Solution for Block 185 Block 185 is a 37-floor building with six basement floors below the ground surface, situated beneath the groundwater. The project is within 300 feet...

Trinity Place

Malcolm's Six-Level Basement Construction at Trinity Place, San Francisco Trinity Place is a four-tower, primarily residential development situated at the corner of Market and 8th Street in San Francisco. For...

Oceanwide Center

Oceanwide Center: Malcolm's Expertise in Deep Foundations and Shoring Situated next to the new Salesforce Transit Center at the intersection of First and Mission Streets in San Francisco, the Oceanwide...

Victoria Island

For the Victoria Island Conveyance Canal Pipeline near Discovery Bay, California, Malcolm Drilling constructed access shafts for micro-tunneling a 96-inch diameter steel casing under the Old River, to allow for...

Port of Miami Tunnel

Retention Systems in Port of Miami's Tunnel Project The Florida Department of Transportation (FDOT) contracted with the Miami Access Tunnel (MAT) concessionaire group to construct two tunnels, each 42 feet...

Mormon Island Auxiliary Dam

Malcolm's Secant Pile Expertise at Mormon Island Auxiliary Dam The Mormon Island Auxiliary Dam Key Block project, where Malcolm served as a subcontractor for the secant pile cut-off wall, aimed...
Malcolm Drilling