Project Category: Drilled Shafts

SFPUC Biosolids

SFPUC Biosolids Digester Facilities: Malcolm Drilling's Successful Partnership The San Francisco Public Utilities Commission (SFPUC) is a city department that provides drinking water and wastewater services to San Francisco, as...

Climate Pledge Arena

Malcolm Drilling's Contribution to Seattle's Climate Pledge Arena Just north of downtown Seattle, Malcolm Drilling was contracted to assist in the construction of a 74-acre state-of-the-art sports complex known as...

Madawaska International Bridge

Madawaska International Bridge Replacement The Madawaska International Bridge, a century-old structure that provides a critical connection between Madawaska, Maine, and Edmundston, New Brunswick, faced replacement due to outdated infrastructure. Securing...

Marathon Petroleum

Marathon Petroleum: Malcolm's Expertise in Transmission Line Installation for Energy Efficiency As part of Marathon Petroleum Corporation's dedication to reducing its carbon footprint, the LASR (Los Angeles Strategic Repositioning) project...

I-43 Corridor

I-43 Corridor Reconstruction: Malcolm Installs Secant Piles and Retaining Walls As part of the reconstruction and expansion of the I-43 corridor north of Milwaukee, Malcolm Drilling installed a series of...

Ship Canal Tunnel

Constructing Seattle's Ship Canal Tunnel to Enhance Water Quality The Ship Canal tunnel underground storage is a 2.7-mile stretch from Ballard to Wallingford. The tunnel will prevent an average of...

30 Van Ness

Malcolm Drilling's Role in San Francisco's 30 Van Ness Development 30 Van Ness is a 47-story mixed-use development in San Francisco's new "Hub" area, featuring 234,000 sq. ft. of office...

Magnolia Avenue BNSF RR

Installing Drilled shafts for the Magnolia Avenue BNSF RR Grade Separation The Magnolia Avenue BNSF RR Grade Separation project involved separating the current grade at Magnolia Avenue crossing by raising...

Cosumnes River Bridge

The Consumnes River Bridge project consisted of replacing the Cosumnes River bridge and Overflow bridge on SR-99 in Elk Grove, CA with two new bridge structures. The structure replacement was...

BNSF Vader Project

Mastering Depths at BNSF Vader The BNSF Vader Project in Castle Rock, Washington, provided an opportunity for Malcolm Drilling to showcase its unique skill set and vast capabilities. Tasked with...

Gordie Howe International bridge

The Gordie Howe International Bridge is a planned border crossing spanning the Detroit River, connecting Detroit, MI to Windsor, Ontario, Canada. This Complex cable-stayed design calls for a main structural...

Crystal Springs

The Crystal Springs / San Andreas Transmission Project is one of the most ambitious jobs that Malcolm Drilling (MDCI) has ever taken on. This job represented part of the $4.6...

Rocky Reach Dam

At first glance, the Rocky Reach Dam project looked like an easy job for Malcolm Drilling. Upon further examination, it became clear that it was anything but. All drilled piles...

Fall Creek/White River Tunnel

Malcolm is installing a total of 32 drop shafts across 16 locations at a new CSO project in Indianapolis, Indiana that is part of the state’s long term water control...

Mid-Coast Corridor Transit

This complex transit project will extend trolley service from the Santa Fe Depot in San Diego, to important downtown destinations including University City, Old Town, the University of California –...

Oceanwide Center

Oceanwide Center: Malcolm's Expertise in Deep Foundations and Shoring Situated next to the new Salesforce Transit Center at the intersection of First and Mission Streets in San Francisco, the Oceanwide...

181 Fremont

The 181 Fremont tower project provided unique challenges due to its tight job site and potential for settlement, and also demonstrates the important role of design build solutions to achieve...

Niles Boulevard Bridge

Precision Drilled Piers: Malcolm Drilling's Role in Bridge Replacement The Niles Boulevard Bridge, spanning the Union Pacific Railroad and BART tracks at the Fremont/Union City border, required a seismic retrofit...

706 Mission

At 706 Mission in San Francisco, Malcolm installed a foundation for a Millennium Partners development that included a 47-story mixed-use tower with 146 residential units and a 4-story Mexican Museum....

Tilikum Crossing

Enhancing Transportation with Deep Foundations and Drilled Shafts The Tilikum Crossing was more than just a bridge; it was a lifeline for the community. This structure was the answer to...
Malcolm Drilling