Project Category: Retention Systems

SFPUC Biosolids

SFPUC Biosolids Digester Facilities: Malcolm Drilling's Successful Partnership The San Francisco Public Utilities Commission (SFPUC) is a city department that provides drinking water and wastewater services to San Francisco, as...

Forte Residence

Deep Soil Mixing on the Intercoastal Waterway. Forte Residence is a new 41-story residential building located on the Intracoastal waterway in West Palm Beach, Florida. Malcolm Drilling was contracted to...

Bertha Rescue Shaft

Malcolm's Solution for Bertha's Underground Rescue Malcolm Drilling was awarded the support of excavation contract to drill the rescue shaft for Bertha, the world’s largest Tunnel Boring Machine (TBM). Bertha...

Miami-Dade Courthouse

Securing Miami-Dade Courthouse by Installing a Retention System Malcolm Drilling was contracted to implement the retention system for the Miami-Dade Courthouse, a historic 28-floor landmark in Miami, Florida. Following safety...

Climate Pledge Arena

Malcolm Drilling's Contribution to Seattle's Climate Pledge Arena Just north of downtown Seattle, Malcolm Drilling was contracted to assist in the construction of a 74-acre state-of-the-art sports complex known as...

Second Narrows Tunnel

Diaphragm Wall Expertise in Metro Vancouver's Second Narrows Tunnel Metro Vancouver is advancing the Second Narrows Tunnel, a critical water supply project under Burrard Inlet, contracted to Malcolm Drilling for...

Priest Rapids Dam

Dam Embankment Improvement: Enhancing Seismic Resilience The Priest Rapids Dam Embankment Improvement Project involved the replacement of the existing right earthen dam embankment with a Roller Compacted Concrete (RCC) structure...

I-43 Corridor

I-43 Corridor Reconstruction: Malcolm Installs Secant Piles and Retaining Walls As part of the reconstruction and expansion of the I-43 corridor north of Milwaukee, Malcolm Drilling installed a series of...

Cistern

Building a Shoring System for a Cistern in San Diego Malcolm Drilling was subcontracted to design and build a Secant Pile Shoring System and Dewatering System for the Support of...

Ship Canal Tunnel

Constructing Seattle's Ship Canal Tunnel to Enhance Water Quality The Ship Canal tunnel underground storage is a 2.7-mile stretch from Ballard to Wallingford. The tunnel will prevent an average of...

Zilker Point

Transforming Challenges into Solutions with Diaphragm Walls Zilker Point, a remarkable architectural project located in Austin, Texas, boasts not only a 7-story above-grade office building but also a 5-story below-grade...

Society Las Olas

Malcolm Drilling's Expertise in Ground Improvement and Deep Foundations at Society Las Olas Society Las Olas, a luxurious community in Fort Lauderdale, marks the newest addition to the city's landscape....

Cathedral Hill

Malcolm's Design-Build for the Sutter Health Van Ness Campus Hospital Malcolm Drilling was contracted to design and construct the temporary support of excavation for the basement of the new hospital...

Riverfront

Transforming the Riverfront in Santa Cruz, CA Situated along the San Lorenzo River in downtown Santa Cruz, California, the Riverfront Project is a development that comprises three 7-story residential apartment...

Four106

Below-Grade Parking Garage Construction in Bellevue, WA. In the heart of Bellevue, Washington, amidst the bustling downtown corridor, Malcolm Drilling was contracted to install dewatering and retention systems for an...

Adrian Science Park

Solutions at MBASP Adrian Science Park: A Deep Dive into Shoring and Dewatering The MBASP Adrian Science Park project, situated at 210 Adrian in Millbrae, CA, is a 260,000 square...

30 Van Ness

Malcolm Drilling's Role in San Francisco's 30 Van Ness Development 30 Van Ness is a 47-story mixed-use development in San Francisco's new "Hub" area, featuring 234,000 sq. ft. of office...

UC Hastings

Building tomorrow: UC Hastings Campus Housing Project in San Francisco UC Hastings Campus Housing project is in San Francisco, with the Federal Office Building across the street to the south....

Project One

Shoring & Dewatering for Project One Construction Project One is the first building in the master plan for the development of 22 acres, featuring a mix of residential, office, and...

Boca Beach House

Boca Beach House Ground Improvement Lying directly at the Boca Inlet and on the edge of Lake Boca is the development of the luxury 4-story property. The Boca Beach House...
Malcolm Drilling