skip to Main Content

Forte Residence

Forte on Flagler, a magnificent development offering stunning views of West Palm Beach, boasting 41 exquisite residences nestled along the picturesque Intercoastal Waterway and the tranquil Atlantic Ocean. Malcolm Drilling was contracted to employ ground Improvement, deep Foundation and retention…

Read more

160 North Elizabeth

160 N Elizabeth Street is a 27-story residential building that is in the growing neighborhood of “West Loop.” A thick layer of water-bearing silt covers the competent glacial hardpan bearing material typical of Chicago. As a result of the presence…

Read more

SoFi Stadium (LA Rams)

CFA Mega Piles The SoFi Stadium in Los Angeles was originally designed on drilled shafts ranging between 24 and 72-inches in diameter. Despite having plenty of real estate around the stadium footprint, the actual construction area was about 100 feet…

Read more

Chase Center

For this high-profile sports stadium and event venue, Malcolm proposed a combination of drilled shafts and CFA MEGA piles to accommodate the variable soil conditions and design requirements. Drilled shafts, socketed deep into bedrock, were used wherever high axial and…

Read more

Brickell City Centre

The Brickell City Centre is a large mixed use facility which includes a five star hotel, luxury condominiums, and high end retail and office space located in Miami, Florida. The project occupies three city blocks (8 acres) and includes two…

Read more

Miami-Dade Courthouse

The historic landmark known as Miami-Dade County Courthouse is a 28-floor structure that stands 361 feet tall in Miami Florida.  On July 9, 2021, the Miami-Dade Courthouse was abruptly shut down for safety concerns with various floors. Malcolm Drilling was…

Read more

SFPUC Biosolids

Drilled Shafts & Continuous Flight Auger (CFA) Piles Malcolm’s expertise for various deep foundation methods helped the designer to optimize the use of Continuous Flight Auger Piles (CFA piles) in lieu of the traditional Cased Drilled Shafts. On this project Malcolm…

Read more

Clark County Water District

CFA Mega Piles Through the Dual Media Filters Phases 3 & 4 CMGC Project, Clark County Water Reclamation District (CCWRD) of Las Vegas, Nevada sought to improve their existing facilities. This project included the construction of a new Filters Building,…

Read more

SLS RESIDENCE

Malcolm Drilling was pleased to participate in development of the SLS Residences project in Hallandale Beach, FL with GT McDonald Enterprises.  Project included over 700 CFA piles of 14 inch and 24 inch diameter, depths up to 90 feet and…

Read more

Oakland UPS

Malcolm Drilling Company Inc. (MDCI) was tasked with providing the foundation support needed for the United Parcel Service (UPS) to introduce sweeping renovations to their Oakland Facility. This included introducing an 87,000 square foot structural steel equipment platform in their…

Read more
Back To Top