skip to Main Content

24th & Harrison

24th and Harrison is a residential mixed-use project that developed a new identity. In the heart of Oakland’s Broadway Auto Row, named for the main thoroughfare’s history of car dealerships and automotive services dating back to 1912. Malcolm Drilling performed…

Read more

I-75 Repair Shaft

Just north of Detroit, Michigan is a stretch of freeway approximately eighteen miles long where the planned reconstruction of I-75 Modernization Project lies. Recent years have seen flooding become a major issue, and the Modernization Project will help prevent flooding…

Read more

SFPUC Biosolids

Design-Build for SFPUC Biosolids Digester Facilities Project San Francisco Public Utilities Commission (SFPUC) is a department of the city that provides drinking water and wastewater services to San Francisco along with, green hydroelectric and solar power to San Francisco municipal…

Read more

SoFi Stadium (LA Rams)

CFA Mega Piles The SoFi Stadium in Los Angeles was originally designed on drilled shafts ranging between 24 and 72-inches in diameter. Despite having plenty of real estate around the stadium footprint, the actual construction area was about 100 feet…

Read more

Adobe North Tower

The north tower at Adobe’s global headquarters in downtown San Jose consists of a two-level underground parking garage along with an 18 story building. We were hired for the temporary shoring and dewatering design and installation. The 35,000 SF temporary…

Read more

Trinity Place

Trinity Place is a 4-tower, mostly-residential development located at the corner of Market and 8th Street in San Francisco. For this prominent downtown project, Malcolm constructed the six-level basements on both Tower 3 and Tower 4. The work on Tower…

Read more

Brickell Flatiron

Malcolm’s Brickell Flatiron project provided a perfect opportunity to debut a new Liebherr LR 1300 crane equipped with a Bermingham lead system to install large diameter, deep CFA Mega Piles. This 64-story building located in Miami’s most sought-after residential community…

Read more

Oceanwide Center

Situated next to the new Salesforce Terminal on the intersection of First and Mission Street in San Francisco, the Oceanwide Center is a mixed-use project including two high rise towers. The 1st Street Tower will be a 910 foot tall,…

Read more

Block 9

Cutter soil mixing, tie back, internal bracing, and jet grouting columns multi-residential project on Block 9 in San Francisco consists of a 43-story tower and two smaller towers on either side. While it is being constructed as one building, it…

Read more

Kings Arena

Installing the Foundation for the Golden 1 Center the New Kings Arena After rumors of the Sacramento Kings moving to a new city, the decision was finally made that they would remain in Sacramento and build “the world’s greatest arena.”…

Read more
Back To Top