skip to Main Content

Magnolia Avenue BNSF RR

The Magnolia Avenue BNSF RR Grade Separation project involved separating the current grade at Magnolia Avenue crossing by raising the roadway over an active BNSF railroad line and constructing a 1,400-foot bridge to improve the traffic flow. The work happened…

Read more

181 Fremont

The 181 Fremont tower project provided unique challenges due to its tight job site and potential for settlement, and also demonstrates the important role of design build solutions to achieve time and cost-effective construction techniques. This 800-foot tower consists of…

Read more

706 Mission

At 706 Mission in San Francisco, Malcolm installed a foundation for a Millennium Partners development that included a 47-story mixed-use tower with 146 residential units and a 4-story Mexican Museum. This project site originally had several challenges including a partially-constructed…

Read more

Echelon Towers

Tishman Contractors and Boyd Gaming selected Malcolm Drilling to utilize its state-of-the-art fleet of top drive hydraulic drill rigs to construct the foundation piles for the 3,300 room Echelon Resort in Las Vegas. This development would host two upscale hotels,…

Read more

Metro Exposition Line

Phase 1 of the Metro Exposition Line project was an 8.6-mile extension of the 73-station Metro Rail System in Los Angeles. It terminates in West Los Angeles at the Venice/Robertson Aerial Station, which is an aerial structure supported by 11,…

Read more
Back To Top