skip to Main Content
Block 185

Block 185

Austin, Texas Block 185 is a 37 floor building with 6 basement floors below ground surface which is below groundwater, the project is within 300 feet from the Colorado river which requires a support of…

read more
Hollywood Presbyterian

Hollywood Presbyterian

Hollywood, California Malcolm Drilling was contracted to design and construct the temporary support of excavation for the basement of the new Acute-Care Services Replacement Hospital Building at the Hollywood Presbyterian Medical Center. The design-build system…

read more
Gravity Pipeline

Gravity Pipeline

Silicon Valley, California This Airport access shaft project is 1 of 3 for the Silicon Valley Clean Water's RESCU program (Regional Environmental Sewer Conveyance Upgrade). The project is the first tunneling progressive design-build of this…

read more
Big Win

Big Win

San Francisco, California Malcolm Drilling is excited to announce that 181 Fremont has received the Award of Excellence from the Council on Tall Buildings & Urban Habitat across a whopping five categories: The Best Tall…

read more

Versatile Solutions

Loma Linda, California The 50-year-old steam plant at the Loma Linda University Health hospital needed a significant foundation upgrade to bring it up to current building codes and prepare for a pending transformer replacement. Much…

read more
Mission: Mitigation

Mission: Mitigation

Valley City, North Dakota After noticing an asphalt depression along a quiet stretch of I-94 near Valley City, North Dakota the local Department of Transportation installed an inclinometer and discovered the freeway embankment had moved…

read more
Towers Of Power

Towers of Power

San Francisco, California Trinity Place is a large, four-tower residential development in downtown San Francisco, with three towers completed and the fourth and final tower well-underway. Malcolm installed the basement foundation for Tower 3, and…

read more
Piles For Miles

Piles for Miles

Logan, Utah In order to provide a value engineered solution for the Logan Wastewater Treatment Facility replacement project, Malcolm Drilling proposed 2,340 piles that will support 12 different structures in lieu of driven steel piles. By the time…

read more
Back To Top