skip to Main Content
Low Headroom – High Stakes

Low Headroom – High Stakes

BNSF Railway - Santa Ana, CA The project is designed to improve the scour protection of the BNSF Railway Bridge foundations during large discharges of the Prado Dam, which is 1 mile upstream from the…

read more
3 Years Later And Malcolm Is Still On Top

3 Years later and Malcolm is still on top

Engineering News-Record 2019 "The Top 600" For the 3rd year in a row Malcolm has maintained its #2 position as a Specialty Foundation Contractor. We're very proud of what our team has accomplished.

read more
Block 185

Block 185

Austin, Texas Block 185 is a 37 floor building with 6 basement floors below ground surface which is below groundwater, the project is within 300 feet from the Colorado river which requires a support of…

read more
Hollywood Presbyterian

Hollywood Presbyterian

Hollywood, California Malcolm Drilling was contracted to design and construct the temporary support of excavation for the basement of the new Acute-Care Services Replacement Hospital Building at the Hollywood Presbyterian Medical Center. The design-build system…

read more
Long Beach Jet Grouting

Long Beach Jet Grouting

The new fire boat station at the Port of Long Beach gets some help from our Jet Grouting guys. They are jetting 6ft columns up to 80ft deep right through 35,000 psi rip-rap boulders to…

read more
Bottom Out!

Bottom Out!

We reached the final excavation depth of 72 feet at our Oceanwide Project in San Francisco. Well done OWC team!!

read more
MSG Sphere

MSG Sphere

Last CFA pile installed for the brand new MSG SPHERE event center in Las Vegas! Watch out for the coolest 'bubble' you have ever seen.

read more
Hydro-cutting In Vancouver

Hydro-cutting in Vancouver

Getting ready to start our next Hydrocutter project in Vancouver, BC for the Second Narrows Tunnel! This one will be a deep one. Stay tuned!

read more
Back To Top