Project Category: Deep Wells

SFPUC Biosolids

SFPUC Biosolids Digester Facilities: Malcolm Drilling's Successful Partnership The San Francisco Public Utilities Commission (SFPUC) is a city department that provides drinking water and wastewater services to San Francisco, as...

Google Bayview Campus

Geothermal Foundation System: Omega Piles and Geothermal Loops The new Google Bay View Campus, located adjacent to NASA’s Ames Research Center in Mountain View, will house 4,000 new employees at...

Building B140

Malcolm Drilling's Design-Build Renovation of Building B140 for Intuitive Surgical Inc. Malcolm Drilling was contracted for the renovation of Building B140, a multifaceted design-build project incorporating retention systems, dewatering, and...

Cistern

Building a Shoring System for a Cistern in San Diego Malcolm Drilling was subcontracted to design and build a Secant Pile Shoring System and Dewatering System for the Support of...

Ship Canal Tunnel

Constructing Seattle's Ship Canal Tunnel to Enhance Water Quality The Ship Canal tunnel underground storage is a 2.7-mile stretch from Ballard to Wallingford. The tunnel will prevent an average of...

Riverfront

Transforming the Riverfront in Santa Cruz, CA Situated along the San Lorenzo River in downtown Santa Cruz, California, the Riverfront Project is a development that comprises three 7-story residential apartment...

Adrian Science Park

Solutions at MBASP Adrian Science Park: A Deep Dive into Shoring and Dewatering The MBASP Adrian Science Park project, situated at 210 Adrian in Millbrae, CA, is a 260,000 square...

UC Hastings

Building tomorrow: UC Hastings Campus Housing Project in San Francisco UC Hastings Campus Housing project is in San Francisco, with the Federal Office Building across the street to the south....

Treasure Island

Dewatering Treasure Island Treasure Island, a serene island nestled in the heart of the San Francisco Bay, offers breathtaking views of the cities iconic skyline. It is the chosen location...

Project One

Shoring & Dewatering for Project One Construction Project One is the first building in the master plan for the development of 22 acres, featuring a mix of residential, office, and...

San Mateo Nutrient Removal WWTP

Retention systems, Ground Improvement & Dewatering at WWTP. Malcolm Drilling was contracted for Phase 1: Site Preparation of the Wastewater Treatment Plant Nutrient Removal and Wet Weather Flow Management Upgrade...

Santa Monica Beach House

Santa Monica Beach Club: Malcolm Drilling's Efficient Solutions Malcolm Drilling was contracted for a project involving both the installation of a tangent pile wall and the design and installation of...

OCSD

Installing Deep wells for New Clarifiers. The Orange County Sanitation District (OCSD) Plant 2 is in Huntington Beach, California and its southern property limit is about 1,600 feet from the...

Santa Clara City Center

Installing Monitoring Wells for Well Abandonments Malcolm Drilling provided the sonic drilling method to abandon 62 wells from the Santa Clara Valley Water District (SCVWD) the field activities were conducted...

SLC Water Treatment Plant

Installing a Groundwater Control System (GWC) Groundwater quality is affected by what happens on the ground above. Malcolm Drilling was hired to design and install a Groundwater Control System (GWC)...

200 Park Ave

Malcolm's Infrastructure Expertise in Shoring and Dewatering at 200 Park Ave, San Jose 200 Park Ave stands as a 19-story tech-oriented office tower, complete with four levels of underground parking,...

Bravern

Bravern Mixed-Use Project Construction The Bravern is a mixed-use project spanning 2,410,000 square feet and situated on a six-acre plot of land in the urban central business district of Washington....
Malcolm Drilling