Project Category: Soldier Pile Walls

Climate Pledge Arena

Malcolm Drilling's Contribution to Seattle's Climate Pledge Arena Just north of downtown Seattle, Malcolm Drilling was contracted to assist in the construction of a 74-acre state-of-the-art sports complex known as...

Building B140

Malcolm Drilling's Design-Build Renovation of Building B140 for Intuitive Surgical Inc. Malcolm Drilling was contracted for the renovation of Building B140, a multifaceted design-build project incorporating retention systems, dewatering, and...

I-43 Corridor

I-43 Corridor Reconstruction: Malcolm Installs Secant Piles and Retaining Walls As part of the reconstruction and expansion of the I-43 corridor north of Milwaukee, Malcolm Drilling installed a series of...

Ship Canal Tunnel

Constructing Seattle's Ship Canal Tunnel to Enhance Water Quality The Ship Canal tunnel underground storage is a 2.7-mile stretch from Ballard to Wallingford. The tunnel will prevent an average of...

Cathedral Hill

Malcolm's Design-Build for the Sutter Health Van Ness Campus Hospital Malcolm Drilling was contracted to design and construct the temporary support of excavation for the basement of the new hospital...

Four106

Below-Grade Parking Garage Construction in Bellevue, WA. In the heart of Bellevue, Washington, amidst the bustling downtown corridor, Malcolm Drilling was contracted to install dewatering and retention systems for an...

Project One

Shoring & Dewatering for Project One Construction Project One is the first building in the master plan for the development of 22 acres, featuring a mix of residential, office, and...

730 Stanyan

730 Stanyan: Design-Build Housing Development Situated at the gateway of Golden Gate Park, 730 Stanyan is a housing development with 160 units designed for low to moderate-income families. It is...

Rainier Square Tower

Rainier Square Tower's Shoring System The Rainier Square Tower is situated in downtown Seattle, spanning nearly an entire city block. This impressive skyscraper stands at 850 feet in height, boasting...

Lloyd Block

Lloyd Block Soldier Pile & Tie-back Wall Project The Lloyd Block development was designed to span three city blocks and includes an existing 17-story concrete building, a new three-story below-grade...

Lucile Packard Children’s Hospital

Foundation Solutions with Soldier Piles and CFA Piles The Stanford University Medical Center Renewal Project included expanding Lucile Packard Children's Hospital, for which Malcolm was contracted by Preston/Top Grade to...
Malcolm Drilling