Malcolm’s scope for this project consisted of stabilizing an abutment slope utilizing 200 permanent double corrosion protected strand anchors. Anchors consisted of 24 strands in 6-inch fully cased holes with a total length of 130 to 200 feet through slide debris. Bond length in rock was 35 feet. Design load for anchors was 275 kips. All drilling was performed using a Klemm KR807 with double flushing head.