skip to Main Content

Kings Arena

Installing the Foundation for the Golden 1 Center the New Kings Arena After rumors of the Sacramento Kings moving to a new city, the decision was finally made that they would remain in Sacramento and build “the world’s greatest arena.”…

Read more

1600 Owens Street

For this six-story parking structure project in San Francisco's Mission District, vibration-free, full displacement OMEGA pile installation was the only option given the vertical load requirements of more than 600 kips. Additionally, variable soil conditions with bearing layers ranging from…

Read more
Terramark_11

Terremark Data Center

Malcolm Drilling was awarded the design build contract to install a foundation system for the Terremark Data Center in Santa Clara, CA.. This new facility was constructed within the existing footprint of a concrete tilt up building next to an…

Read more

Plant 1-101

Malcolm was awarded a design build contract for the foundation system of the Sludge Dewatering and Odor Control Project at Plant 1 for Orange County Sanitation District in Fountain Valley, California. The site conditions included various layers of clay, silty…

Read more
Back To Top